In 2025, Sun-Ways installed 48 solar panels along a stretch of active railway in Buttes, Switzerland. 🚈 Now, 1 year into their 3-year pilot project, more than 11,000 trains have rolled directly over the panels at speeds up to 55 mph, and the installation has remained stable, safe, and productive. 🌞

In 2025, Sun-Ways installed 48 solar panels along a stretch of active railway in Buttes, Switzerland. 🚈 Now, 1 year into their 3-year pilot project, more than 11,000 trains have rolled directly over the panels at speeds up to 55 mph, and the installation has remained stable, safe, and productive. 🌞 submitted by /u/sg_plumber
[comments]

Similar Posts

Leave a Reply

Your email address will not be published. Required fields are marked *